G.03 · Geotechnical Engineering

Excavation & Shoring

Urban development in Metro Vancouver demands deep excavations in tight sites — often immediately adjacent to existing buildings, utilities, and property lines. Temporary earth retention keeps the excavation open, protects adjacent structures, and allows construction to proceed safely. Getting the design right is non-negotiable.

The Work

Design-and-support, not design-and-disappear

Many shoring engineers hand over a stamped drawing and move on. We remain engaged through construction — attending pre-construction meetings, responding to RFIs as conditions are exposed, reviewing instrumentation data, and providing field observations at critical stages. The design is only as good as the construction support behind it.

We design systems for underground parkades, utility cut-and-cover trenches, and any excavation where adjacent structures, services, or property lines impose constraints. System selection — sheet pile, soldier pile with timber lagging, secant or tangent pile walls, or grouted anchors — is driven by soil conditions from the geotechnical investigation, excavation depth, adjacent structure sensitivity, and schedule.

Dewatering strategy is integrated into the shoring design from the start, not bolted on afterward. Where ground conditions require it, we design sump, wellpoint, or deep-well dewatering systems and assess drawdown effects on adjacent structures.

Typical Applications

  • →Underground parkades (1–4 levels)
  • →Basement excavations near property lines
  • →Utility trench cut-and-cover
  • →Excavations adjacent to existing buildings
  • →Shoring design review & peer review

Adjacent structure protection. Settlement monitoring programs for nearby buildings and utilities are integrated as a standard part of urban shoring work — not an optional add-on.

Scope of Services

What is included

Services are scoped to the specific excavation geometry, ground conditions, and adjacent structure constraints.

  • Temporary earth retention system selection & design
  • Sheet pile wall design (Larssen, Z, U sections)
  • Soldier pile & timber lagging wall design
  • Secant & tangent pile wall design
  • Tieback anchor & deadman anchor system design
  • Internal bracing & raker design
  • Dewatering system design (sump, wellpoint, deep well)
  • Drawdown analysis & radius of influence
  • Settlement risk assessment for adjacent structures
  • Instrumentation layout: inclinometers, settlement monuments
  • Construction monitoring & field reviews
  • RFI response & as-built condition review
How It Works

From design brief to construction sign-off

Shoring design is most efficient when geotechnical investigation data is available at the outset. We can work from existing borehole data or scope the investigation and shoring design together.

  1. 01

    Site & data review

    We review the geotechnical investigation data, existing utility records, adjacent building foundations, and excavation geometry. Constraints are mapped: property lines, anchor zone restrictions (easements, utilities), groundwater levels, and any adjacent structure settlement limits.

  2. 02

    System selection & design

    We select the retention system type based on soil conditions, depth, dewatering requirements, and adjacent structure sensitivity. Structural analysis (limit equilibrium, beam-spring models) establishes wall embedment, section modulus requirements, anchor forces, and walings. Dewatering requirements are sized and integrated.

  3. 03

    Drawings & specifications

    We produce sealed shoring drawings, specifications, and a monitoring program for permit submission and contractor tender. The monitoring program defines instrumentation types, locations, alert levels, and reporting requirements — and is designed to give the geotechnical engineer early warning of any wall or ground movement that warrants review.

  4. 04

    Construction support

    We attend pre-construction meetings, conduct field reviews at critical stages (initial shoring installation, each excavation lift, anchor testing), review monitoring data as submitted, and respond to RFIs as conditions are exposed. Construction sign-off and as-built review are provided at completion.

Deliverables

What you receive

Sealed drawings and a monitoring program suitable for building permit submission and contractor tender. Construction-phase support continues through sign-off.

  • Signed & sealed shoring design drawings
  • Structural calculations package
  • Shoring specifications for tender
  • Dewatering design (if applicable)
  • Adjacent structure settlement risk assessment
  • Instrumentation & monitoring program
  • Pre-construction condition survey recommendations
  • Construction monitoring reports
  • RFI responses (written, within agreed turnaround)
  • Construction completion letter & as-built review
Related Services

Shoring connects to ground conditions and what comes after

Shoring design draws on investigation data and feeds into foundation and dewatering design.

← All services

Planning a deep excavation?

Send us your site plan and excavation geometry and we will advise on system options, permit requirements, and timeline within one business day.