Selected Work
Selected Projects.
A selection of completed investigations, designs, and construction monitoring programs. Full project portfolio currently in preparation.
Coming Soon
We are selecting completed projects to share here.
Our team is currently compiling a selection of completed projects. Check back soon.
Start a project →
Investigation
SPT-2024-012
Metro Vancouver, BC
Mixed-Use Development — Subsurface Investigation
Multi-phase borehole and CPT program for a 22-storey mixed-use tower on deltaic soils. Included liquefaction assessment and seismic site classification per NBCC 2020.
Geotechnical Investigation
Foundation
SPT-2024-014
Surrey, BC
Residential Tower — Pile Foundation Program
Driven displacement pile design for a 16-storey residential tower on soft deltaic deposits. Included static load test program and construction monitoring through to substantial completion.
Foundation Design
Shoring
SPT-2024-011
Vancouver, BC
4-Level Parkade — Urban Excavation
Soldier pile and tieback anchor system for a 14-metre deep excavation in a constrained urban site adjacent to a heritage masonry building. Included inclinometer monitoring.
Excavation + Shoring
Slope
SPT-2023-076
North Vancouver, BC
Residential Slope — Hazard Assessment & Remediation
Slope hazard assessment, limit-equilibrium modelling (SLOPE/W), seismic analysis, and remediation design for a steep residential lot. Included development permit geotechnical letter for DNVR.
Slope Stability
Investigation
SPT-2023-891
Burnaby, BC
Commercial Development — Pre-Design Site Characterisation
Site characterisation program for a large-format retail development on former industrial land. Included environmental coordination, bearing capacity assessment, and lateral earth pressure analysis.
Geotechnical Investigation
Ground Improvement
SPT-2023-003
Langley, BC
Industrial Warehouse — Preloading on Soft Soils
Preloading with prefabricated vertical drains (PVDs) for a 30,000 m² industrial warehouse on compressible deltaic soils. Included settlement monitoring and QA back-analysis confirming target consolidation.
Ground Improvement
Have a project in mind?
Describe your site conditions and project type. We will respond within one business day with preliminary thoughts on scope and approach.